docs(02-02): complete per-item regeneration + summary counter plan
Tasks completed: 2/2 - PostCard regen button with inline form, topic override, badge - OutputReview summary counter with regenerated/edited tracking SUMMARY: .planning/phases/02-prompt-control-output-review/02-02-SUMMARY.md Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -5,33 +5,33 @@
|
||||
See: .planning/PROJECT.md (updated 2026-03-07)
|
||||
|
||||
**Core value:** Generare un calendario di 13 caroselli Instagram strategicamente orchestrati, pronti per Canva Bulk Create, con un click dalla Web UI.
|
||||
**Current focus:** Phase 2 in corso — Prompt Control + Output Review
|
||||
**Current focus:** Phase 2 COMPLETA — Prompt Control + Output Review
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 2 of 4 (Prompt Control + Output Review)
|
||||
Plan: 1 of 2 in current phase
|
||||
Status: In progress — 02-01 completato, 02-02 da eseguire
|
||||
Last activity: 2026-03-08 — Completed 02-01-PLAN.md (Prompt CRUD + Prompt Editor UI)
|
||||
Plan: 2 of 2 in current phase — PHASE COMPLETE
|
||||
Status: Phase 2 complete — ready for Phase 3 or deploy
|
||||
Last activity: 2026-03-08 — Completed 02-02-PLAN.md (Per-item Regeneration + Summary Counter)
|
||||
|
||||
Progress: [█████░░░░░] 55% (5/9 piani totali)
|
||||
Progress: [██████░░░░] 66% (6/9 piani totali)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 5
|
||||
- Total plans completed: 6
|
||||
- Average duration: ~7 min
|
||||
- Total execution time: 38 min
|
||||
- Total execution time: 42 min
|
||||
|
||||
**By Phase:**
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 01-core-generation-pipeline | 4/4 COMPLETA | 33 min | 8 min |
|
||||
| 02-prompt-control-output-review | 1/2 | 5 min | 5 min |
|
||||
| 02-prompt-control-output-review | 2/2 COMPLETA | 9 min | 4.5 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: 6 min, 9 min, 8 min, 10 min, 5 min
|
||||
- Last 5 plans: 9 min, 8 min, 10 min, 5 min, 4 min
|
||||
- Trend: velocita' in aumento
|
||||
|
||||
*Updated after each plan completion*
|
||||
@@ -60,21 +60,23 @@ Recent decisions affecting current work:
|
||||
- [01-04]: localResults separato in OutputReview per edit inline senza mutare cache TanStack Query
|
||||
- [verification-fix]: GenerateResponse include calendar per badge PN/Schwartz nel frontend
|
||||
- [02-01]: PromptService init lazy via _get_prompt_service() per sincronizzazione con lifespan directory
|
||||
- [02-02]: Regen notes passate via campo tono in GenerateRequest (pragmatico, no backend changes)
|
||||
- [02-02]: Edit detection manuale via JSON.stringify comparison (trascurabile con 13 post)
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
- [Phase 1]: Validare token usage reale per batch 13 post con claude-sonnet-4-5 — inter_request_delay=2.0s configurato, da validare in produzione
|
||||
- [Phase 1]: Baseline qualita' prompt italiani da validare dopo prima generazione reale
|
||||
- [Deploy]: Phase 1 completa — serve vps-lab-deploy per testare end-to-end il sistema
|
||||
- [Deploy]: Phase 2 completa — serve vps-lab-deploy per testare end-to-end il sistema
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-03-08
|
||||
Stopped at: Completed 02-01-PLAN.md (Prompt CRUD + Prompt Editor UI)
|
||||
Stopped at: Completed 02-02-PLAN.md (Per-item Regeneration + Summary Counter) — Phase 2 COMPLETE
|
||||
Resume file: None
|
||||
|
||||
## Next Actions
|
||||
|
||||
1. Eseguire 02-02-PLAN.md (Output Review enhancements)
|
||||
2. Completare Phase 2
|
||||
3. `vps-lab-deploy` per deployare su VPS e testare end-to-end
|
||||
1. `vps-lab-deploy` per deployare su VPS e testare end-to-end
|
||||
2. Pianificare Phase 3 (Canva-ready CSV polish + advanced export)
|
||||
3. Eseguire Phase 3
|
||||
|
||||
Reference in New Issue
Block a user