docs(02-01): complete prompt CRUD + prompt editor plan
Tasks completed: 2/2 - Backend prompts router with 4 CRUD endpoints - Frontend Prompt Editor page with types, hooks, route, sidebar SUMMARY: .planning/phases/02-prompt-control-output-review/02-01-SUMMARY.md Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -5,33 +5,34 @@
|
||||
See: .planning/PROJECT.md (updated 2026-03-07)
|
||||
|
||||
**Core value:** Generare un calendario di 13 caroselli Instagram strategicamente orchestrati, pronti per Canva Bulk Create, con un click dalla Web UI.
|
||||
**Current focus:** Phase 1 completata e verificata — pronta per deploy e Phase 2
|
||||
**Current focus:** Phase 2 in corso — Prompt Control + Output Review
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 1 of 4 (Core Generation Pipeline) — COMPLETE
|
||||
Plan: 4 of 4 in current phase
|
||||
Status: Phase 1 COMPLETATA e VERIFICATA — gap fix applicato per calendar slot merge
|
||||
Last activity: 2026-03-08 — Phase 1 completata, verificata, gap corretto
|
||||
Phase: 2 of 4 (Prompt Control + Output Review)
|
||||
Plan: 1 of 2 in current phase
|
||||
Status: In progress — 02-01 completato, 02-02 da eseguire
|
||||
Last activity: 2026-03-08 — Completed 02-01-PLAN.md (Prompt CRUD + Prompt Editor UI)
|
||||
|
||||
Progress: [████░░░░░░] 25% (4/9 piani totali)
|
||||
Progress: [█████░░░░░] 55% (5/9 piani totali)
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 4
|
||||
- Average duration: ~8 min
|
||||
- Total execution time: 33 min
|
||||
- Total plans completed: 5
|
||||
- Average duration: ~7 min
|
||||
- Total execution time: 38 min
|
||||
|
||||
**By Phase:**
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 01-core-generation-pipeline | 4/4 COMPLETA | 33 min | 8 min |
|
||||
| 02-prompt-control-output-review | 1/2 | 5 min | 5 min |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 4 plans: 6 min, 9 min, 8 min, 10 min
|
||||
- Trend: baseline stabile ~8 min/piano
|
||||
- Last 5 plans: 6 min, 9 min, 8 min, 10 min, 5 min
|
||||
- Trend: velocita' in aumento
|
||||
|
||||
*Updated after each plan completion*
|
||||
|
||||
@@ -58,6 +59,7 @@ Recent decisions affecting current work:
|
||||
- [01-04]: Download CSV sempre via POST con edits inline (non GET originale)
|
||||
- [01-04]: localResults separato in OutputReview per edit inline senza mutare cache TanStack Query
|
||||
- [verification-fix]: GenerateResponse include calendar per badge PN/Schwartz nel frontend
|
||||
- [02-01]: PromptService init lazy via _get_prompt_service() per sincronizzazione con lifespan directory
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
@@ -68,13 +70,11 @@ Recent decisions affecting current work:
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-03-08
|
||||
Stopped at: Phase 1 completata e verificata — pronta per deploy
|
||||
Stopped at: Completed 02-01-PLAN.md (Prompt CRUD + Prompt Editor UI)
|
||||
Resume file: None
|
||||
|
||||
## Next Actions
|
||||
|
||||
Phase 1 completata. Prossimi passi:
|
||||
1. `vps-lab-deploy` per deployare su VPS e testare end-to-end
|
||||
2. Configurare API key in Impostazioni UI
|
||||
3. Generare primo calendario reale per validare qualita' prompt e token usage
|
||||
4. Poi procedere con Phase 2 (Prompt Control + Output Review)
|
||||
1. Eseguire 02-02-PLAN.md (Output Review enhancements)
|
||||
2. Completare Phase 2
|
||||
3. `vps-lab-deploy` per deployare su VPS e testare end-to-end
|
||||
|
||||
Reference in New Issue
Block a user