docs(phase-1): complete Core Generation Pipeline phase

Phase 1 executed (4 plans, 3 waves), verified, gap fixed.
36 requirements marked Complete in traceability table.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
Michele
2026-03-08 03:15:43 +01:00
parent d8e3eb9415
commit 4894e09707
4 changed files with 269 additions and 51 deletions

View File

@@ -5,16 +5,16 @@
See: .planning/PROJECT.md (updated 2026-03-07)
**Core value:** Generare un calendario di 13 caroselli Instagram strategicamente orchestrati, pronti per Canva Bulk Create, con un click dalla Web UI.
**Current focus:** Phase 1 completata — pronta per deploy e Phase 2
**Current focus:** Phase 1 completata e verificata — pronta per deploy e Phase 2
## Current Position
Phase: 1 of 4 (Core Generation Pipeline)
Phase: 1 of 4 (Core Generation Pipeline) — COMPLETE
Plan: 4 of 4 in current phase
Status: Phase 1 COMPLETATA — tutti e 4 i piani eseguiti
Last activity: 2026-03-08 — Completato 01-04-PLAN.md (Web UI React completa)
Status: Phase 1 COMPLETATA e VERIFICATA — gap fix applicato per calendar slot merge
Last activity: 2026-03-08 — Phase 1 completata, verificata, gap corretto
Progress: [████░░░░░░] 25% (4/16 piani totali stimati)
Progress: [████░░░░░░] 25% (4/9 piani totali)
## Performance Metrics
@@ -55,10 +55,9 @@ Recent decisions affecting current work:
- [01-03]: Settings.api_key merge: PUT non sovrascrive con None se non inclusa nel body
- [01-03]: Pipeline singleton in generate.py per mantenere _jobs tra request, con fallback da disco
- [01-04]: Palette stone/amber per design B2B non generico (non gradienti viola)
- [01-04]: EditableField come componente generico click-to-edit (no dipendenze esterne)
- [01-04]: refetchInterval condizionale nel hook useJobStatus (non nel componente)
- [01-04]: Download CSV sempre via POST con edits inline (non GET originale)
- [01-04]: localResults separato in OutputReview per edit inline senza mutare cache TanStack Query
- [verification-fix]: GenerateResponse include calendar per badge PN/Schwartz nel frontend
### Blockers/Concerns
@@ -68,14 +67,14 @@ Recent decisions affecting current work:
## Session Continuity
Last session: 2026-03-08T01:29:53Z
Stopped at: Completato 01-04-PLAN.md — Web UI React completa con tutte le pagine e componenti
Last session: 2026-03-08
Stopped at: Phase 1 completata e verificata — pronta per deploy
Resume file: None
## Next Actions
Phase 1 completata. Prossimi passi suggeriti:
Phase 1 completata. Prossimi passi:
1. `vps-lab-deploy` per deployare su VPS e testare end-to-end
2. Configurare API key in Impostazioni UI
3. Generare primo calendario reale per validare qualita' prompt e token usage
4. Poi procedere con Phase 2 (Image Pipeline - URL Unsplash) o Phase 3 (Advanced Features)
4. Poi procedere con Phase 2 (Prompt Control + Output Review)