Michele
|
6078c75c22
|
docs(04): create phase plan
Phase 04: Enrichment
- 2 plan(s) in 2 wave(s)
- Wave 1: backend UnsplashService + Settings + pipeline/CSV integration
- Wave 2: frontend Settings UI + PostCard thumbnail + OutputReview hint
- Ready for execution
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
|
2026-03-09 01:52:13 +01:00 |
|
Michele
|
c85ec644d1
|
docs(03): complete organization-layer phase
Phase 3 verified: 5/5 must-haves passed
- SwipeService CRUD on data/swipe_file.json
- 5 REST endpoints for Swipe File management
- SwipeFile UI page with add/edit/delete/filter
- topic_overrides in CalendarRequest + pipeline wiring
- Swipe File picker in Genera Calendario form
Requirements completed: SWP-01, SWP-02, SWP-03, SWP-04, UI-06
|
2026-03-09 01:26:17 +01:00 |
|
Michele
|
b366742f51
|
docs(03-02): complete swipe-to-calendar integration plan
Tasks completed: 2/2
- Task 1: topic_overrides in CalendarRequest + pipeline wiring
- Task 2: picker Swipe File nel form Genera Calendario + mark-used
SUMMARY: .planning/phases/03-organization-layer/03-02-SUMMARY.md
|
2026-03-09 00:34:59 +01:00 |
|
Michele
|
babdf8a250
|
docs(03-01): complete SwipeService CRUD + SwipeFile UI plan
Tasks completed: 2/2
- Task 1: Backend — SwipeService + Pydantic schemas + FastAPI router
- Task 2: Frontend — TypeScript types + TanStack hooks + pagina SwipeFile + navigazione
SUMMARY: .planning/phases/03-organization-layer/03-01-SUMMARY.md
|
2026-03-09 00:27:24 +01:00 |
|
Michele
|
05988f4be5
|
docs(03): create phase plan
Phase 03: Organization Layer
- 2 plan(s) in 2 wave(s)
- Wave 1: SwipeService CRUD + API + UI (parallel-ready)
- Wave 2: Swipe-to-calendar integration (depends on 03-01)
- Ready for execution
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
|
2026-03-08 23:21:41 +01:00 |
|
Michele
|
d8335585bf
|
docs(02): complete prompt-control-output-review phase
Phase 2 verified: 16/16 must-haves passed
- PRM-05, UI-05 requirements marked Complete
- Roadmap updated with Phase 2 completion
|
2026-03-08 22:36:04 +01:00 |
|
Michele
|
5ba641e7d6
|
docs(02): create phase plan
Phase 02: Prompt Control + Output Review
- 2 plan(s) in 2 wave(s)
- Wave 1: 02-01 (Prompt Editor backend+frontend)
- Wave 2: 02-02 (Per-item regen + summary counter)
- Ready for execution
|
2026-03-08 20:17:29 +01:00 |
|
Michele
|
4894e09707
|
docs(phase-1): complete Core Generation Pipeline phase
Phase 1 executed (4 plans, 3 waves), verified, gap fixed.
36 requirements marked Complete in traceability table.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
|
2026-03-08 03:15:43 +01:00 |
|
Michele
|
60b46cb5c1
|
docs(01-03): complete pipeline LLM + API routers plan
Tasks completed: 2/2
- Task 1: LLMService, CSVBuilder, GenerationPipeline
- Task 2: API routers (calendar, generate, export, settings) e wiring main.py
SUMMARY: .planning/phases/01-core-generation-pipeline/01-03-SUMMARY.md
|
2026-03-08 02:16:49 +01:00 |
|
Michele
|
3f1dbbf396
|
docs(01): create phase plan
Phase 01: Core Generation Pipeline
- 4 plan(s) in 3 wave(s)
- Wave 1: 01-01 (infra) + 01-02 (core services) parallel
- Wave 2: 01-03 (LLM pipeline + API routers)
- Wave 3: 01-04 (Web UI) with human-verify checkpoint
- Ready for execution
|
2026-03-08 01:27:25 +01:00 |
|
Michele
|
fed78f0e43
|
docs: create roadmap (4 phases)
Phases:
1. Core Generation Pipeline: 36 requirements (infra + calendar + LLM + CSV + UI)
2. Prompt Control + Output Review: 2 requirements
3. Organization Layer: 5 requirements (swipe file)
4. Enrichment: 3 requirements (Unsplash)
All 46 v1 requirements mapped to phases.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
|
2026-03-07 14:37:14 +01:00 |
|