Commit Graph

5 Commits

Author SHA1 Message Date
Michele
d8335585bf docs(02): complete prompt-control-output-review phase
Phase 2 verified: 16/16 must-haves passed
- PRM-05, UI-05 requirements marked Complete
- Roadmap updated with Phase 2 completion
2026-03-08 22:36:04 +01:00
Michele
4894e09707 docs(phase-1): complete Core Generation Pipeline phase
Phase 1 executed (4 plans, 3 waves), verified, gap fixed.
36 requirements marked Complete in traceability table.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-08 03:15:43 +01:00
Michele
696b265e4d fix(01): revise plans based on checker feedback
- Fix CSV-01 column count: 32 -> 33 (8 meta + 24 slide + 1 caption)
- Add TopicResult Pydantic model + topic_generator.txt prompt
- Make bulk generation async with background task + polling endpoint
- Add POST /api/export/{job_id}/csv for inline edit CSV download
- Split Plan 01-04 Task 2 into 2a/2b/2c (badges, slideviewer, pages)
- Update ProgressIndicator to use polling on /status endpoint
- Add --yes flag and frontend/ prerequisite note to Plan 01-01

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-08 01:40:30 +01:00
Michele
fed78f0e43 docs: create roadmap (4 phases)
Phases:
1. Core Generation Pipeline: 36 requirements (infra + calendar + LLM + CSV + UI)
2. Prompt Control + Output Review: 2 requirements
3. Organization Layer: 5 requirements (swipe file)
4. Enrichment: 3 requirements (Unsplash)

All 46 v1 requirements mapped to phases.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-07 14:37:14 +01:00
Michele
1dedf7cf98 docs: define v1 requirements
46 requirements across 9 categories
8 requirements deferred to v2

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-07 14:30:30 +01:00