Files
postgenerator/.planning/STATE.md
Michele babdf8a250 docs(03-01): complete SwipeService CRUD + SwipeFile UI plan
Tasks completed: 2/2
- Task 1: Backend — SwipeService + Pydantic schemas + FastAPI router
- Task 2: Frontend — TypeScript types + TanStack hooks + pagina SwipeFile + navigazione

SUMMARY: .planning/phases/03-organization-layer/03-01-SUMMARY.md
2026-03-09 00:27:24 +01:00

4.0 KiB

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-03-07)

Core value: Generare un calendario di 13 caroselli Instagram strategicamente orchestrati, pronti per Canva Bulk Create, con un click dalla Web UI. Current focus: Phase 3 — Organization Layer (Plan 1/2 completato)

Current Position

Phase: 3 of 4 (Organization Layer) Plan: 1 of 2 in current phase — In progress Status: In progress — Plan 03-01 completo, manca 03-02 Last activity: 2026-03-09 — Completed 03-01-PLAN.md (SwipeService + pagina SwipeFile)

Progress: [███████░░░] 77% (7/9 piani totali)

Performance Metrics

Velocity:

  • Total plans completed: 7
  • Average duration: ~6.5 min
  • Total execution time: 47 min

By Phase:

Phase Plans Total Avg/Plan
01-core-generation-pipeline 4/4 COMPLETA 33 min 8 min
02-prompt-control-output-review 2/2 COMPLETA 9 min 4.5 min
03-organization-layer 1/2 In corso 5 min 5 min

Recent Trend:

  • Last 5 plans: 8 min, 10 min, 5 min, 4 min, 5 min
  • Trend: stabile intorno a 5 min

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • [Setup]: FastAPI root_path SOLO via Uvicorn (--root-path), mai nel costruttore FastAPI()
  • [Setup]: CSV encoding = utf-8-sig (BOM) sempre; CANVA_FIELDS locked come costante
  • [Setup]: Prompt di sistema scritti IN italiano
  • [Setup]: Per-item error isolation dal primo loop di generazione
  • [01-01]: root_path SOLO via Uvicorn --root-path nel Dockerfile CMD
  • [01-01]: API_BASE='/postgenerator/api' nel frontend — Pitfall #9 risolto
  • [01-02]: CANVA_FIELDS 33 colonne con _image_keyword (non URL) — URL Unsplash in Phase 4
  • [01-02]: PromptService usa ValueError per variabili mancanti
  • [01-03]: LLMService._parse_retry_after() legge header HTTP per wait esatto (fallback 60s)
  • [01-03]: asyncio.to_thread wrappa LLM sync calls nel background task async
  • [01-03]: Settings.api_key merge: PUT non sovrascrive con None se non inclusa nel body
  • [01-03]: Pipeline singleton in generate.py per mantenere _jobs tra request, con fallback da disco
  • [01-04]: Palette stone/amber per design B2B non generico (non gradienti viola)
  • [01-04]: Download CSV sempre via POST con edits inline (non GET originale)
  • [01-04]: localResults separato in OutputReview per edit inline senza mutare cache TanStack Query
  • [verification-fix]: GenerateResponse include calendar per badge PN/Schwartz nel frontend
  • [02-01]: PromptService init lazy via _get_prompt_service() per sincronizzazione con lifespan directory
  • [02-02]: Regen notes passate via campo tono in GenerateRequest (pragmatico, no backend changes)
  • [02-02]: Edit detection manuale via JSON.stringify comparison (trascurabile con 13 post)
  • [03-01]: SwipeService lazy init identico a PromptService (DATA_PATH creato nel lifespan FastAPI)
  • [03-01]: IDs brevi uuid4.hex[:12] — leggibili, no rischio collisione con volumi Swipe File
  • [03-01]: PUT con comportamento PATCH-like per nicchia/note — None cancella il valore
  • [03-01]: Filtro nicchia derivato dinamicamente da items (no config separata)

Blockers/Concerns

  • [Phase 1]: Validare token usage reale per batch 13 post con claude-sonnet-4-5 — inter_request_delay=2.0s configurato, da validare in produzione
  • [Phase 1]: Baseline qualita' prompt italiani da validare dopo prima generazione reale
  • [Deploy]: Phase 2+3 plan1 complete — serve vps-lab-deploy per testare end-to-end il sistema
  • [03-02]: La route /swipe-file e il hook useSwipeItems sono pronti per l'integrazione nel form Genera Calendario

Session Continuity

Last session: 2026-03-09 Stopped at: Completed 03-01-PLAN.md (SwipeService + SwipeFile UI) — Plan 1/2 Phase 3 Resume file: None

Next Actions

  1. Eseguire 03-02-PLAN.md (Swipe-to-calendar integration: topic_overrides + picker Swipe File)
  2. vps-lab-deploy per deployare su VPS e testare end-to-end il sistema
  3. Pianificare Phase 4 (Enrichment: Unsplash integration)