Archived: - milestones/v1-ROADMAP.md (full phase details) - milestones/v1-REQUIREMENTS.md (46/46 shipped) - milestones/v1-MILESTONE-AUDIT.md (audit report) Created: - MILESTONES.md (project milestone history) Deleted: - REQUIREMENTS.md (fresh one for next milestone) Updated: - PROJECT.md (requirements → Validated, decisions with outcomes) - ROADMAP.md (collapsed to one-line v1 summary) - STATE.md (reset for next milestone) v1 MVP: 4 phases, 10 plans, 46 requirements, 8080 LOC Timeline: 2 days (2026-03-07 → 2026-03-09) Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
5.6 KiB
milestone, audited, status, scores, gaps, tech_debt
| milestone | audited | status | scores | gaps | tech_debt | ||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| v1 | 2026-03-09T11:30:00Z | tech_debt |
|
|
Milestone v1 Audit Report — PostGenerator
Milestone: v1 — MVP Content Marketing Automation Audited: 2026-03-09T11:30:00Z Status: TECH_DEBT (no blockers, accumulated debt)
Scores
| Area | Score | Details |
|---|---|---|
| Requirements | 46/46 | Tutti i requisiti v1 soddisfatti |
| Phases | 4/4 | Tutte le fasi completate e verificate |
| Integration | 4/4 | Cross-phase wiring verificato |
| E2E Flows | 4/4 | Tutti i flussi utente funzionanti |
Phase Verification Summary
| Phase | Status | Score | Critical Gaps |
|---|---|---|---|
| 01 - Core Generation Pipeline | gaps_found → RISOLTO | 3/5 → 5/5 | Slot-merge gap corretto in Phase 2 |
| 02 - Prompt Control + Output Review | passed | 16/16 | Nessuno |
| 03 - Organization Layer | passed | 5/5 | Nessuno |
| 04 - Enrichment | passed | 5/5 | Nessuno |
Phase 1 Gap Resolution
Il gap critico originale (result.slot undefined in PostCard) e' stato risolto:
OutputReview.tsxrighe 32-41: merge CalendarSlot in PostResult viajobData.calendar?.slotsGenerateResponse.calendarpopolato correttamente dageneration_pipeline.pyriga 205- BadgePN, BadgeSchwartz, metadata e retry/regen funzionano tutti
Requirements Coverage
Tutti i 46 requisiti v1 sono soddisfatti:
| Area | Requirements | Status |
|---|---|---|
| Calendar & Campaign | CAL-01..07 (7) | Tutti Complete |
| Format Selection | FMT-01..02 (2) | Tutti Complete |
| LLM Generation | LLM-01..06 (6) | Tutti Complete |
| Prompt System | PRM-01..05 (5) | Tutti Complete |
| CSV & Export | CSV-01..04 (4) | Tutti Complete |
| Image Keywords | IMG-01..04 (4) | Tutti Complete |
| Swipe File | SWP-01..04 (4) | Tutti Complete |
| Web UI | UI-01..08 (8) | Tutti Complete |
| Infrastructure | INF-01..06 (6) | Tutti Complete |
E2E Flow Verification
| Flow | Status | Details |
|---|---|---|
| 1. Genera Calendario → Progress → Review → CSV | Funzionante | Pipeline completa, polling 2s, merge slot, download CSV con edits |
| 2. Swipe File → Topic Override → Generazione | Funzionante | CRUD swipe + picker inline + override pre-LLM + mark-used |
| 3. Prompt Editor → Genera → Rigenera singolo | Funzionante | CRUD prompts, file letti a runtime, regen con topic/notes override |
| 4. Unsplash Config → Genera → Thumbnail + CSV URLs | Funzionante | Settings API key, UnsplashService con cache, resolve keyword→URL, thumbnail lazy |
Cross-Phase Integration
| From | To | Via | Status |
|---|---|---|---|
| Phase 1 (GenerationPipeline) | Phase 2 (Regen) | POST /generate/single + PostCard handleRegen | WIRED |
| Phase 1 (CalendarService) | Phase 3 (Topic Override) | CalendarRequest.topic_overrides | WIRED |
| Phase 1 (CSVBuilder) | Phase 4 (Unsplash) | image_url_map in build_csv() | WIRED |
| Phase 2 (OutputReview localResults) | Phase 4 (Thumbnails) | PostCard cover_image_keyword startsWith(http) | WIRED |
| Phase 3 (SwipeService) | Phase 1 (GenerateCalendar form) | useSwipeItems + topicOverrides state | WIRED |
| Phase 4 (UnsplashService) | Phase 1 (Pipeline) | _resolve_unsplash_keywords after batch | WIRED |
Tech Debt
Media Priorita'
1. Pipeline singleton non invalidato su API key change
- File:
backend/routers/generate.pyrighe 109-117 - Impatto: Utente che cambia API key via Settings deve riavviare il container
- Fix: Invalidare
_pipeline_instance = Nonenel PUT /settings quando api_key cambia
Bassa Priorita'
2. Campo campagna inviato inutilmente nel POST export
- File:
frontend/src/api/hooks.tsriga 185 - Impatto: Nessuno (Pydantic ignora campi extra), solo rumore
- Fix: Rimuovere
campagnadal payload frontend o aggiungerlo al schema backend
3. brand_name hardcoded in generation_pipeline.py
- File:
backend/services/generation_pipeline.pyriga 290 - Impatto: Brand name non personalizzabile senza modifica codice
- Fix: Leggere da settings.json (commento nel codice indica intenzione futura)
4. Job interrotti durante restart non recuperabili
- Impatto: Job in-flight durante restart sono persi
- Fix: Salvare stato intermedio su disco durante la generazione (non prioritario per uso single-user)
Totale: 4 items across 2 aree (1 media, 3 bassa)
Human Verification Pending
Le seguenti verifiche richiedono il deployment su VPS e un test manuale:
- Web UI accessibile su https://lab.mlhub.it/postgenerator/
- Generazione end-to-end con API key Anthropic reale
- CSV in Excel con caratteri italiani intatti
- Unsplash thumbnails con API key Unsplash reale
- Persistenza dati Swipe File dopo restart container
Conclusion
Il milestone v1 e' funzionalmente completo. Tutti i 46 requisiti sono implementati e verificati a livello di codice. I 4 flussi E2E sono collegati correttamente cross-fase. Il tech debt accumulato e' minimo (4 items, nessuno bloccante) e puo' essere accettato per procedere al deploy e alla validazione umana.
Audited: 2026-03-09T11:30:00Z Auditor: Claude Opus 4.6 (gsd-audit-milestone orchestrator) + Claude Sonnet 4.6 (gsd-integration-checker)