Archived: - milestones/v1-ROADMAP.md (full phase details) - milestones/v1-REQUIREMENTS.md (46/46 shipped) - milestones/v1-MILESTONE-AUDIT.md (audit report) Created: - MILESTONES.md (project milestone history) Deleted: - REQUIREMENTS.md (fresh one for next milestone) Updated: - PROJECT.md (requirements → Validated, decisions with outcomes) - ROADMAP.md (collapsed to one-line v1 summary) - STATE.md (reset for next milestone) v1 MVP: 4 phases, 10 plans, 46 requirements, 8080 LOC Timeline: 2 days (2026-03-07 → 2026-03-09) Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
1.7 KiB
1.7 KiB
Project Milestones: PostGenerator
v1 MVP Content Marketing Automation (Shipped: 2026-03-09)
Delivered: Sistema completo di generazione caroselli Instagram B2B con pipeline AI, prompt editor, swipe file e integrazione Unsplash — 46/46 requisiti soddisfatti.
Phases completed: 1-4 (10 plans total)
Key accomplishments:
- Pipeline completa di generazione contenuti AI: CalendarService (13 slot PN+Schwartz), LLMService (retry 429/5xx, backoff), GenerationPipeline async con job polling e per-item error isolation
- Web UI React completa con 7 pagine, design stone/amber B2B, 15+ hook TanStack Query, SlideViewer con edit inline e PostCard con badge PN/Schwartz
- Sistema di 7 prompt italiani editabili via UI con CRUD completo, variabili live, confronto default/modificato e reset
- Swipe File con integrazione calendario: CRUD + picker inline per topic override su 13 slot, attraversa l'intero stack frontend->backend->pipeline
- Export CSV Canva-ready con 33 colonne locked, utf-8-sig, supporto edit inline, e risoluzione Unsplash keyword->URL con cache disco
- Architettura Docker production-ready: multi-stage build, subpath /postgenerator/ con pitfall risolti, proxy_net, named volume
Stats:
- 48 source files created/modified
- 8,080 lines of code (4,157 Python + 3,923 TypeScript)
- 4 phases, 10 plans, ~58 min total execution
- 2 days from init to ship (2026-03-07 → 2026-03-09)
- 51 git commits
Git range: 5335b3b (docs: initialize project) → latest
Tech debt accepted: 4 items (1 medium, 3 low) — pipeline singleton invalidation, unused campagna field, hardcoded brand_name, non-recoverable interrupted jobs
What's next: Deploy su VPS (vps-lab-deploy) e validazione end-to-end con API key reali (Claude + Unsplash)