Tasks completed: 2/2 - Task 1: Backend — SwipeService + Pydantic schemas + FastAPI router - Task 2: Frontend — TypeScript types + TanStack hooks + pagina SwipeFile + navigazione SUMMARY: .planning/phases/03-organization-layer/03-01-SUMMARY.md
4.0 KiB
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-03-07)
Core value: Generare un calendario di 13 caroselli Instagram strategicamente orchestrati, pronti per Canva Bulk Create, con un click dalla Web UI. Current focus: Phase 3 — Organization Layer (Plan 1/2 completato)
Current Position
Phase: 3 of 4 (Organization Layer) Plan: 1 of 2 in current phase — In progress Status: In progress — Plan 03-01 completo, manca 03-02 Last activity: 2026-03-09 — Completed 03-01-PLAN.md (SwipeService + pagina SwipeFile)
Progress: [███████░░░] 77% (7/9 piani totali)
Performance Metrics
Velocity:
- Total plans completed: 7
- Average duration: ~6.5 min
- Total execution time: 47 min
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 01-core-generation-pipeline | 4/4 COMPLETA | 33 min | 8 min |
| 02-prompt-control-output-review | 2/2 COMPLETA | 9 min | 4.5 min |
| 03-organization-layer | 1/2 In corso | 5 min | 5 min |
Recent Trend:
- Last 5 plans: 8 min, 10 min, 5 min, 4 min, 5 min
- Trend: stabile intorno a 5 min
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:
- [Setup]: FastAPI root_path SOLO via Uvicorn (--root-path), mai nel costruttore FastAPI()
- [Setup]: CSV encoding = utf-8-sig (BOM) sempre; CANVA_FIELDS locked come costante
- [Setup]: Prompt di sistema scritti IN italiano
- [Setup]: Per-item error isolation dal primo loop di generazione
- [01-01]: root_path SOLO via Uvicorn --root-path nel Dockerfile CMD
- [01-01]: API_BASE='/postgenerator/api' nel frontend — Pitfall #9 risolto
- [01-02]: CANVA_FIELDS 33 colonne con _image_keyword (non URL) — URL Unsplash in Phase 4
- [01-02]: PromptService usa ValueError per variabili mancanti
- [01-03]: LLMService._parse_retry_after() legge header HTTP per wait esatto (fallback 60s)
- [01-03]: asyncio.to_thread wrappa LLM sync calls nel background task async
- [01-03]: Settings.api_key merge: PUT non sovrascrive con None se non inclusa nel body
- [01-03]: Pipeline singleton in generate.py per mantenere _jobs tra request, con fallback da disco
- [01-04]: Palette stone/amber per design B2B non generico (non gradienti viola)
- [01-04]: Download CSV sempre via POST con edits inline (non GET originale)
- [01-04]: localResults separato in OutputReview per edit inline senza mutare cache TanStack Query
- [verification-fix]: GenerateResponse include calendar per badge PN/Schwartz nel frontend
- [02-01]: PromptService init lazy via _get_prompt_service() per sincronizzazione con lifespan directory
- [02-02]: Regen notes passate via campo tono in GenerateRequest (pragmatico, no backend changes)
- [02-02]: Edit detection manuale via JSON.stringify comparison (trascurabile con 13 post)
- [03-01]: SwipeService lazy init identico a PromptService (DATA_PATH creato nel lifespan FastAPI)
- [03-01]: IDs brevi uuid4.hex[:12] — leggibili, no rischio collisione con volumi Swipe File
- [03-01]: PUT con comportamento PATCH-like per nicchia/note — None cancella il valore
- [03-01]: Filtro nicchia derivato dinamicamente da items (no config separata)
Blockers/Concerns
- [Phase 1]: Validare token usage reale per batch 13 post con claude-sonnet-4-5 — inter_request_delay=2.0s configurato, da validare in produzione
- [Phase 1]: Baseline qualita' prompt italiani da validare dopo prima generazione reale
- [Deploy]: Phase 2+3 plan1 complete — serve vps-lab-deploy per testare end-to-end il sistema
- [03-02]: La route
/swipe-filee il hookuseSwipeItemssono pronti per l'integrazione nel form Genera Calendario
Session Continuity
Last session: 2026-03-09 Stopped at: Completed 03-01-PLAN.md (SwipeService + SwipeFile UI) — Plan 1/2 Phase 3 Resume file: None
Next Actions
- Eseguire 03-02-PLAN.md (Swipe-to-calendar integration: topic_overrides + picker Swipe File)
vps-lab-deployper deployare su VPS e testare end-to-end il sistema- Pianificare Phase 4 (Enrichment: Unsplash integration)